Diamond Offshore jackup Ocean Titan was the low bidder on Part 1 of Pemex Tender 514-11 opened on July 5. The program calls for a 350-ft IC jackup for an 872-day contract starting August 13, 2011. Final award will be made July 19. The rig has been stacked in West Cameron Block 84 since mid-June after it completed a contract with ANKOR Energy. In Parts 2 and 3 of the tender, no bids were submitted for either; the requirements were voided and will be re-tendered at a later date.
ABS surveys and repair work have been completed on jackup Hercules 120, and the rig has returned to its contract with Chevron, moving to South Timbalier Block 37 late last week. The rig is under contract through the end of the year, with two 6-month options remaining. Jackup Hercules 204 has begun the final well of its contract with Pisces Energy, LLC. The well in Ship Shoal Block 227 is scheduled to take about 30 days, after which the rig will go to Stone Energy Corporation for a two well, 60-day contract. With all the work, the rig would next be available in mid-October. Breton Energy, LLC received its permits ...